Our current effort

Statements & position papers

Read Supervisor Jennifer Allen’s statement and SAOSA’s position paper in full.

From The Fence Post, November 2026

Supervisor Allen’s Position on Repsol’s Proposed Solar Farm and Battery Storage Facility

Since the start of the summer, your Pima County District 3 team has heard a lot of concerns from Three Points residents and local organizations about Repsol’s proposed utility-scale solar farm and battery storage facility in the Altar Valley. We have attended almost every community meeting and open house to understand residents’ concerns and to learn details of the project itself (since Repsol has not yet submitted any formal applications to Pima County).

Last week, I sat down with representatives from Repsol to learn whether the community feedback they’ve been hearing has resulted in any changes to their plan. At the end of the meeting, I informed them that I will not support the project. My opposition stems from the project’s impacts on the community, especially for neighbors closest to the proposed site, the impacts on our conservation lands in the area, and because of my commitment to equity and climate justice.

Impacts on the community

Given the massive size of the project, we’ve heard from residents whose homes would be surrounded on three sides by solar panels for as far as they can see. People shared stories grieving the loss of the desert that their kids would not get the chance to grow up exploring. Others expressed concerns about losing access to ranch and farmlands that generations of their family have cultivated. We’ve witnessed over a hundred residents come together, time and time again at community meetings with questions, concerns, and opposition. Now, with the formation of the Southern Arizona Open Space Alliance, there is a watch-dog for development in the area that can amplify the voice, concerns and vision of a beautiful community that thousands of Pima County residents call home.

Impacts to hard-earned conservation lands

We’ve heard concerns about the increased risk of wildfire, further spread of invasive species, and potential harms to plant and animal life in the area. Almost the entire project area is within Pima County’s Conservation Lands System (CLS), with major portions designated as important riparian and biological core management areas, which are among the most vulnerable of CLS classifications. Recognizing that, Altar Valley ranchers, farmers, and residents have worked with county, state and federal partners for years to develop and implement protections for the Altar Valley and the Brawley wash – establishing wildlife corridors, revegetating historically damaged areas, and preventing the spread of invasive fire-prone weeds, to name a few – all while preserving the rural traditions of ranching and farming. This work is valuable, as are the rural traditions and culture of the region.

Commitment to equity and climate justice

No one can dispute my commitment to fighting climate change and its effects on communities who are impacted first and worst. I spent a decade working for a national environmental organization that included founding Chispa, a multi-state program ensuring Latino families have a voice in local policy decisions impacting clean air, water, land and climate. I understand the urgency for transitioning quickly to large scale renewable energy, especially as our monopoly utilities are over-committing to data centers and extending the life of dirty coal-fired power plants. At the same time, I understand that transition to renewables shouldn’t come at the cost of lands and waterways that have been painstakingly restored and conserved.

There is also an elephant in the room that needs to be named: the greatest demand for energy is from industrial, commercial and residential projects in urban and suburban areas. Until I see our utilities, and the profiting private energy developers, make commensurate renewable generation investments in urban areas, it is neither reasonable nor acceptable to expect rural communities to bear the brunt of large energy projects.

This is one project – a VERY large project – that was proposed for Three Points, and despite the community’s and my opposition, the project has not yet gone away. We still have work to do. The energy demand from data centers and AI is a real danger. Energy developers and utilities will continue to look for solutions in our backyard (and probably our front and side yards too!).

An organized community is a powerful community whose voice echoes through the hallways of policy makers, so thank you to everyone who has attended community meetings, gathered signatures, and got involved in different ways. While we’re not done yet, Three Points has come together in impressive and powerful ways and is making a lasting difference in Pima County. We look forward to continuing to work together! Adelante!

Reprinted from The Fence Post, the Three Points/Robles Junction community newsletter, November 2026, page 1. Read the full newsletter at friendsofroblesranch.org.

SAOSA position paper

Why Build the Three Points Solar and Battery Storage Project?

This position paper presents the views and analysis of SAOSA’s Steering Committee. Its conclusions about where the project’s electricity would go, including to data centers, are SAOSA’s assessment and have not been established as fact.

Where is the demand coming from?

Why build the Three Points Solar and Battery Storage Project? Where is the demand coming from? We believe its net effect—whether intentional or unintentional—will be to support the rush to build massive hyperscale data centers that relatively few Arizonans want anywhere near them. The electricity it produces will inevitably feed into the vast pool of electricity directed at all customers, including hyperscale data centers. Yet this project, or even a smaller version, could impose a significant, irreparable loss on an intact desert ecosystem, our communities, and traditional land use in the northern Altar Valley. Claiming a project can power, say, 124,000 homes does not mean it actually will power 124,000 homes. That is simply a measure of power generation, not a statement about who or what will use it. Once in the grid, electricity can go anywhere, nearby or far away, to any customer, even a data center.

Our position is clear: No solar farm, battery storage, or data center belongs anywhere in the Altar Valley.

Renewable energy is needed, and many of us benefit from implementing it on rooftops and on our land. People in the Altar Valley are certainly not against renewable energy! But in this era of hyperscale data centers, we suggest that rushing utility-scale projects into locations like the Altar Valley demands an immense environmental sacrifice while doing little to slow climate change or provide cheaper electricity to businesses and homeowners. The rush to build utility-scale renewable projects across the West’s open spaces is happening without a measured discussion of how they will permanently affect our lives, our communities, the ecosystem, and our inspiring Western landscapes.

A 2024 report Lawrence Berkeley National Laboratory prepared for the U.S. Department of Energy shows that in 2023, Data Centers used 4.4% of all U.S. electricity, including homes, businesses, office towers, big-box stores, baseball stadiums, and EV charging—everything that uses electricity. The same study projects the data center share could grow to between 6.7% and 12% by 2028. Fossil Fuel and Nuclear power plants take a long time to permit and build, and they face complex regulatory controls. Utility-scale renewables can be built much faster, with less regulatory overhead. In 2024, the AZ Corporation Commission approved, or caused to be added, more than 4,700 MW of new capacity, 82% of which is expected to come from solar farms and battery storage. It seems reasonable to ask whether the rush to build utility-scale renewables indicates that the renewables focus has shifted to data center demand, away from reducing electricity bills or combating climate change.

Pima County’s Sonoran Desert Conservation Plan singles out the Altar Valley as a place of special conservation importance, with the highest number of priority vulnerable species and streams and a high potential for cultural sites. Why on earth would we allow 5,554 acres (more than 8 square miles) of this green desert to be sacrificed to so-called “green energy”? What is the sense of this? The rush to build hyperscale data centers in inappropriate places seems contagious, leading some to push vast renewable projects into wildly inappropriate places—case in point: the Altar Valley.

We see three factors leading to the Western renewable project land-rush that now presents itself here, in the magnificent Altar Valley:

  1. Demand from the buildout of power-hungry, hyper-scale data centers, which is
  2. Enabled by the availability of state trust land under ASLD’s mandate to maximize returns for trust beneficiaries (the “highest and best use” doctrine recommended in 1912), and
  3. Accelerated by generous federal tax credits for battery storage, which remain available to projects that begin construction before 2033, even after the 2025 tax law cut back credits for solar.

These factors are converging right here, in this community, in the wild and inspiring open space of the Altar Valley. This region’s unique attributes are why the Sonoran Desert Conservation Plan made it a focal point for preservation and conservation. Now it is under dire threat. The Altar Valley is literally the poster child for placing vast renewable energy projects where they absolutely do not belong.

Are we saying we don’t need hyperscale data centers? No.

Are we saying we don’t need utility-scale renewable projects? No.

We are saying that building any utility-scale renewable energy project in a place as special as the Altar Valley is woefully ill-conceived. The U.S. Energy Information Administration’s own price data make the point: from 2023 to 2025, as utility-scale renewables climbed from 13.7% to 20.5% of Arizona’s generation, the average inflation-adjusted price of electricity did not fall. It held essentially flat at about 13 cents per kilowatt-hour. Adding another project of the same kind is unlikely to deliver any significant rate relief; at best, its benefit to ratepayers would be too small to measure. But we believe a utility-scale renewable energy project in the Altar Valley will devastate a fragile ecosystem in a beautiful valley that remains almost wholly unfragmented by development. It will also impact our lives and communities, from the Tucson mountains to the Tohono O’odham Nation.

We urge you to oppose this badly sited project and save the Altar Valley as we know it.

Data sources

  1. Lawrence Berkeley National Laboratory (for the U.S. Department of Energy), “2024 United States Data Center Energy Usage Report,” Figure ES-1. escholarship.org/uc/item/32d6m0d1
  2. Solar Energy Industries Association, Arizona Solar and Storage Report, retrieved Sep. 25, 2026: battery storage capacity 26.5 GWh; 13,198 MW DC of solar installed; 18,435 MW projected over the next 5 years (ranks 3rd). Utility-scale solar growth significantly outpaces the residential sector. seia.org/state-solar-policy/arizona-solar
  3. Arizona Corporation Commission, “Solar Power Surging in Arizona, Across the U.S.,” Feb. 4, 2025. azcc.gov
  4. Utility-scale renewables as a fraction of Arizona generation: EIA Electricity Data Browser
  5. Electricity cost per kWh in Arizona since 2010: EIA Form EIA-861 (2010–2020) and Electric Power Annual, Table 2.10 (2021–2025)

Also published in The Fence Post, November 2026, page 3.